AAC Block Making Machine in China

Product Details
Customization: Available
Certification: ISO9001: 2000, CE, ISO 9001:2000
Type: AAC Block Production Line
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
311
Year of Establishment
2009-07-14
Find Similar Products

Basic Info.

Model NO.
aac block making machine
Capacity
50000-300000cubic Meter a Year
Raw Material
Flyash/Sand
Size
Adjustable
Features
Heat-Resistent, Stable
Voltage
380V
Power
300kw
Price
Lower
Quality
Good
Warranty
One Year
Certificates
ISO/CE
Transport Package
Nud Package or on Clients Demand
Specification
iso ce
Trademark
sunite
Origin
Shandong Provine, China Mainland
HS Code
84748090
Production Capacity
50000-300000cubic Meter One Year

Product Description

The Production Process Of Autoclaved Aerated Concrete Block
1. Raw material storage
Flyash, sand, cement, lime, gypsum and aluminum powder should be stored separately in the corresponding stock yard. Then they will be disposed separately and transported to each work section when used.
2. Raw material disposed
Flyash and sand will be transported into the wet ball mill by the conveyor belt. Afterwards by slurry pump the slurry will be transported into slurry tank.
3. Batching, mixing and pouring
The lime and cement will be transported successively by the screw conveyor into automatic weigher for weighs, and the slurry will be transported by the slurry pump into automatic weigher for weighs. Afte weighing the powder and slurry will be transported into the mixer for uniformity and pouring into the mould box.
4. Curing, Cutting
The slurry which be poured into the mold box will pre-harden in the curing room which temperature is 40-50 degrees in one or three hours. When the body meets hardness of being cut, it will be transported with the mould box by reversal crane into the cutting cart. Then it will move with the cutting cart for level and vertical cutting.
5. Autoclaved and Finished product
The cut body will be putted on marshalling site by the crane. The marshalling body will be transported into the autoclaved kettle by the hauling engine or mobile windlass for 8-10 hours maintenance. Afterwards the finished products will be pulled away from the the autoclaved kettle by the hauling engine, with separating and packing they transported into stock by forklift.

Raw material :
 Parameter name  Parameter value
 Fly ash  65-70%
 cement  6-15%
 lime  18-25%
 gypsum  3-5%
 Aluminum powder paste  8
 Water & material rate  0.60-0.65
 Casting temperature  36-40°C
 Aluminum mixing time  30-40s
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier